There are 5 project offices in the framework of the development and investments department of Salavatnefteorgsintez JSC. The project offices are aimed towards realization of the strategically important trends of growth. Urea PO oversees implementation of urea production retrofitting works. The reconstruction performance follows the programmed schedule. Project documentation development comes to a close. The chemical water treatment package retrofitting project in Mineral fertilizer plant is progressing according to the fixed schedule.
Large scale retrofitting projects in Oil refinery plant is supervised by "Bitumen, Visbreaking, Catalytic cracking" project office. Construction works at bitumen production are successfully completed. "Viscosity breaking" project is in progress. At present catalytic cracking project is at the preparation for construction stage of development.
Project office "Polyethylene" supervises Polyethylene project.
Sulzer Company process technology on Polystyrene project is at the further development stage. New equipment shall be installed in place of the operating extruder. This work is within the scope of Polystyrene PO. Project ‘Oil Refinery ТК-2 plant ELOU block Re-equipment" shall also be carried out by the above office. The project target is to produce stable, purified, demercaptanized condensate from Karachaganak deposit suitable for further shipment by rail way or for processing by own technological units.
The following works are within the scope of "EP -380 Modernization" project office: cracking heaters replacement, turbo compressor M-1 steam turbine renewal to increase EP-300 production capacity up to 380 kt/y.